Before beginning to service the pump, TURN OFF the power.
• Open an outlet to relieve the pressure in the system. If the pump is located below the supply tank, ensure that the supply tank valve is closed to prevent water leakage during service.
• Disconnect the wires from the terminals and remove the old pressure switch from the pump.
• Determine the pump model and vintage from the diagram above.
• Assemble the parts for your model in the sequence shown.
• Tighten intermediate screws (if used) to 15 inch-pounds of torque.
• Tighten switch screws to 7 inch-pounds of torque.
• Replace the terminals with the new terminals supplied in this kit.
Note: The pre-mounted screw on the face of the switch housing is the pressure adjustment screw. This is a factory pre-set switch, DO NOT ADJUST. Possible damage to the system or even injury is possible. Adjustments other than the one made by the factory voids the warranty.
• Externally on the plastic switch cover, there is a screw hole to attach the cover to the switch once the switch is installed on the pump housing.
• A separate screw is provided for this installation. Older types of Jabsco switches either did not use a cover or had a rubber boot.
• Close all outlets.
• Turn power on to the pump.
• Open an outlet to bleed trapped air from the system.
• When bubbles stop, close the outlet and confirm that the pump turns off automatically.
• Check for leaks and proper operation.